MELI Base Failure Reset + VCP

Text book model of a 11.5 week flat base + base failure reset(constructive shakeout) + VCP with 3Contractions and massive volume dry up before the breakout and massive volume on the breakout.
flatbaseshakeoutSupply and DemandVCP

Also on:

Disclaimer