NG is in a downtrend. Price made a LL DB (divergence). Placed a long position in 1hr HV DZ. Risk= $250. Target= Top of measured move.
Order cancelled
Canceled the trade as it was countertrend trade.
Multiple Time Frame AnalysisSupply and DemandVolume

Disclaimer