GREEN410NOV28GREEN410NOV28GREEN410NOV28

GREEN410NOV28

No trades
See on Supercharts

BGNVA analysis



Key facts


Issue date
Nov 10, 2021
Maturity date
Nov 10, 2028
Outstanding amount
‪100.00 M‬EUR
Face value
10,000.00EUR
Minimum denomination
100,000.00EUR
Coupon
2.63% (Fixed)
Yield to maturity
3.47%
Greenvolt – Energias Renováveis SA engages in the designing, engineering, and maintenance of biomass power stations. It operates through following segments: Residual Biomass , Development, and Distributed Generation. The Residual Biomass segment includes the energy production plants through forest biomass in Portugal, the costs of the corporate structure of GreenVolt, as well as the plant in Tilbury in the United Kingdom. The Development segment develops, constructs, and explores photovoltaic and wind energy. The Distributed Generation segment refers to the contributions from the subsidiaries Track Profit Energy, Track Profit II Invest, and Perfecta Energía. The company was founded in 2002 and is headquartered in Porto, Portugal.
Go deeper with bond data
Access the most important data for bonds including coupon rates, issue ratings, redemption data and more.